With a procedure for a mass sale, the Casino group communicates with a volunteer to separate from GreenYellow.
Branch of Energy Creation in 2007, the company of the implanter in the French countryside in the installation of solar panels on the infrastructure of the group. According to this company, 72% of the Casino is developed internationally and has an interest in energy certificates.
In the Casino group this chain is separated, it is a party for its dissent. But also say that GreenYellow has a lot to invest in. Le groupe s’attend à recevoir des offres d’ici la semaine prochaine. Arrivera alors le temps des négociations.
Between 150,000 and 200,000 solar panels are installed in the metropolis
In the name of this branch, it will be the largest of the Ligériens, a project of great envelope to fill this pass in the company of energy and Saint-Etienne Metropolis in 2019.
150 sites of the metropolitan area around the solarium panels of the 2050 solarium, dont the iconic Geoffroy-Guichard stage, the Opera or the Museum of Modern Art.
In total, between 150,000 and 200,000 solar panels were installed at the end of the project. It also has a capacity of 15,000 tons of CO2 per year, and produces 30 GWh of renewable energy, consumption, high heat, plus 12,000 locomotives.